Managing Technologies in Project Variants

Activate and deactivate energy technologies in your project variants to build flexible configurations and compare solution options.

Understanding Technologies in Variants

Eturnity projects support multiple energy technologies that you can combine in different ways within each variant. This flexibility allows you to create and compare different solution proposals for the same project—for example, comparing a PV-only system versus a PV system with battery storage and heat pump.

Which technologies you can use depends on your license. An administrator can change their names under Settings > Technologies; by default, they are:

  • Photovoltaics (PV): Solar panel systems for electricity generation

  • Battery storage: Energy storage systems to maximize self-consumption

  • Heating system: Heat pumps and other heat generators, solar thermal and thermal storage

  • E-mobility: Electric vehicle charging stations as a cost item; they do not change the energy simulation, and you model the charging consumption independently with charging setups on the Consumption profile page

  • Energy management: Energy management systems as a cost item; they do not change the energy simulation

  • Meter: only for companies in Switzerland

  • Freely definable technologies: Custom technologies configured in your company settings

Note: Freely definable technologies are created by an administrator under Settings > Technologies, provided your license includes them. If your company has created freely definable technologies, they will appear alongside the standard technologies and can be activated/deactivated in the same way.

Each project variant can have a different combination of active technologies, enabling you to present multiple options to your customer without creating separate projects.

Key Benefit: Activating or deactivating technologies allows you to quickly adapt your project proposal to changing customer requirements. Instead of creating multiple projects, you can maintain up to ten options as variants within a single project.

Prerequisites

Before you can activate or deactivate technologies in a variant:

  • Opened Variant: You change technologies in the variant you have opened (on the project home page with Open variant); the cards on the project home page only display them

  • Available Technologies: The technology must be enabled for your company; this depends on your licence. If you don't see a specific technology option, contact your administrator or Eturnity support (by email to support@eturnity.com or in the chat).

  • Component Library: Your component library should include components for the technologies you want to activate

How to Activate or Deactivate Technologies

Step 1: Navigate to the Offer Variants Section

  1. Open your project in Eturnity Expert. It opens on its project home page, in the Overview tab.

  2. In the Offer variants section, there is a card for each variant of your project

  3. Each card shows the variant's technologies as icons; you see the name of a technology when you hover over it. The most recently opened variant is marked Last viewed, or after duplicating, the new copy. You cannot toggle the technologies on the cards

Step 2: Select the Variant You Want to Modify

  1. Under Offer variants, locate the card of the variant you want to modify

  2. On the card, click Open variant. This makes it the active variant; its card then shows Last viewed. If another variant is already open, switch at the top in the breadcrumbs in the selection field showing the variant name.

  3. Only the active variant can have its technologies modified—this ensures you're always working with the correct variant configuration. The planning, cost and results pages and the Offer page also show and use only the active variant; the Customer and Building pages apply to all variants. On the Offer page, each variant has its own settings and texts. A duplicated variant takes over the Page order, the Address and the Branding; texts you have changed in the PDF preview, such as the offer text, are not taken over: there, the copy starts with your company's default.

Important: The cards on the project home page display the technologies but cannot change them. You can only change the technologies in the opened variant, so always open the variant first.

Step 3: Toggle Technology Activation

  1. At the top of the sidebar, click the Technologies row; next to it are the icons of this variant's technologies

  2. The Select active technologies list opens, with one field for each technology that is active in your company; this variant's technologies are highlighted

  3. Click on a technology to toggle it:

  4. To activate a technology: Click on a technology that is not highlighted—it will be highlighted and added to your variant. For battery storage, if the variant does not have one yet, Eturnity automatically inserts the first non-archived battery storage added to your library; you can choose a different model afterwards on the Battery storage page.

  5. To deactivate a technology: Click on a highlighted technology—it is then no longer highlighted, and the technology no longer counts in this variant. Nothing is deleted: Eturnity keeps the technology's components and settings, and they are back when you activate it again.

  6. Eturnity saves the change automatically shortly after your last click and recalculates costs and subsidies; while it is saving, a loading icon spins next to the heading of the list. The sidebar then adapts to the selected technologies. If a page that only belongs to a deselected technology is open at that moment, such as Roof plan or Virtual storage, Eturnity switches to the Variant overview page. You update the simulation yourself (step 4).

Closing: Clicking the Technologies row again or pressing Esc closes the list. If the sidebar is collapsed to its narrow view, the Technologies row is missing; expand the sidebar again using the icon at its top right.

Step 4: Review the Updated Variant

  1. Costs and subsidies are recalculated as soon as you toggle a technology. In variants with photovoltaics, the simulation—and with it the profitability—is then outdated: on the Variant overview or Offer page, click Update in the notice Your simulation is not up-to-date.

  2. Check the impact on other pages, such as Bill of materials, Variant overview or Offer

  3. On the Offer page, the pages of a deactivated technology remain in this variant's Page order, for example PV pages after you deactivate photovoltaics. Check the page order afterwards

Important Rules and Limitations

Minimum One Active Technology

Every project variant must have at least one active technology. If you attempt to deactivate the last remaining technology in a variant, the system will display a warning message and prevent the deactivation:

System Message: "You must have selected at least one technology per variant. The technology was not deactivated."

Why this rule exists: A variant without any active technology would be an empty project configuration with no components, calculations, or meaningful data.

Tips for Effective Technology Management

  • Name Variants Clearly: Use descriptive names that indicate which technologies are active (e.g., "PV + Battery", "PV Only", "Full Energy Solution")

  • Start with Maximum Configuration: Begin with all relevant technologies active, then create simplified variants: on the project home page, under Offer variants, click Duplicate in the three-dot menu of the variant card; this is possible if your licence includes it and the project has fewer than ten variants. In the window, under Active systems of the new offer variant, deselect the technologies that should be dropped and create the variant. This is easier than building up from a minimal configuration. Afterwards, check the Page order on the Offer page in each simplified variant.

  • Check Component Availability: Before activating a technology, ensure you have appropriate components in your library. Missing components will create gaps in your system design.

  • Review Financial Impact: Activating or deactivating technologies can change investment costs, operating costs, and profitability. The costs of E-mobility and Energy management only count towards the PV investment if, on the Profitability page in the technology's tab, the switch under Feasibility calculation treatment is on; when the technology is first switched on in a variant, the switch is set to your company's default. For an existing PV system, they only count with Self-consumption community solar (also used for a ZEV in Switzerland), not with Self-consumption or Feed-in only. Afterwards, check the Bill of materials (investment costs) and, in variants with photovoltaics, once you have updated the simulation, the Variant overview (profitability). You will find operating costs and subsidies in the Financials group.

  • Document Differences: When presenting multiple variants to customers, clearly explain which technologies differ between variants and why this matters for their specific needs.

Troubleshooting

Technologies Cannot Be Switched on the Project Home Page

Cause: You are on the project home page. The cards under Offer variants display the technologies but cannot change them.

Solution: On the variant's card, click Open variant and then, at the top of the sidebar, click the Technologies row.

I Don't See a Specific Technology Option

Cause: The technology is not enabled for your company; this depends on your licence. Under Select active technologies, only technologies that are active in your company appear (Settings > Technologies).

Solution: Contact your administrator or Eturnity support (by email to support@eturnity.com or in the chat) to verify which technologies are available in your licence and request activation if needed.

System Displays Warning When Deactivating a Technology

Cause: You're attempting to deactivate the last remaining technology in a variant.

Solution: Every variant must have at least one active technology. If you want to create a variant without a specific technology, first activate a different technology before deactivating the one you want to remove.

Project Calculations Don't Update After Technology Change

Cause: Eturnity recalculates costs and subsidies immediately when you toggle a technology. In variants with photovoltaics, however, the simulation is then outdated and only runs when you update it.

Solution: On the Variant overview or Offer page, click Update in the notice Your simulation is not up-to-date. If issues persist, refresh your browser and check if changes were saved.