In addition to adding Activities normally, you can save a lot of time by copying an Activity (and all its composite Tasks) in a single step. You can even copy Activities across Studies on the same site.
📌 Note: Any Analyst, or a Moderator assigned to the Study, can copy Activities.
In the Activities tab of your Study, locate the Activity you want to copy, open its drop-down menu and select Copy.
In the confirmation dialog, optionally check Include start date, due date and archive date, then press Copy.
In the same or a different Study, select the Add or Paste Activity card, then choose Paste Activity (this can be repeated several times).
Define a new Activity name and confirm all configuration options (e.g., Activity dates and visibility settings).
📌 Note: Copied Activities are not linked together, which permits them to be modified without impacting each other or the original.