Skip to main content

Material Ordering from Wholesalers

Order material directly from your project's bill of materials at your wholesaler – no manual typing.

What is material ordering?

Ordering a sold project from your wholesaler normally means transferring the bill of materials by hand into an order form or the provider's webshop – component by component, article numbers included.

Your benefit: with an ordering subscription, you create the order directly from the project's bill of materials. Components, quantities and – where set – article numbers are carried over automatically; you only adjust what's really needed.

Prerequisites

  • Administrator role, to set up an ordering subscription

  • Which wholesalers offer material ordering depends on your country and licence – for example Krannich or Solarmarkt in Switzerland, Tepto in Germany

Setting up an ordering subscription

  1. Navigate to Library > Subscriptions

  2. Find the Ordering type collection for your wholesaler in the Subscriptions table and click Subscribe

Once the subscription is active, the extra Order entry appears in every project in the sidebar of an opened variant under Planning.

Creating an order

The Order page in a project initially contains a single tab, Bill of materials. As long as no order exists yet, it is still empty and shows the Create Order button. The order belongs to the whole project: the page shows the same order in every variant; you choose which variant you order for when you create it.

  1. Open a project, on the project home page open a variant with Open variant and in it the Order page (sidebar, Planning group); click Create Order in the Bill of materials tab

  2. In the Variant field, choose the project variant you want to order for (the variant marked Last viewed on the project home page is preselected) and confirm with Continue – the bill of materials is taken as a snapshot at this point; optional items aren't included

Once the order is created, a second tab, Order Placements, appears next to Bill of materials – both sit on the same Order page.

Adjusting the bill of materials for the order

In the Bill of materials tab, you now see all the items carried over, with supplier & article number (from the component library), component, internal item number, bill-of-materials quantity and order quantity. Adjust the order quantity here – independently of the bill-of-materials quantity, for instance if you already have material in stock – and click Save.

Then select the items you want to order – all selected items must have the same supplier – and click Continue. The Delete button lets you discard the entire material order for this project again, together with its entries in Order Placements.

Sending an order

Once you click Continue, the supplier order opens in its own tab on the Order page, next to Bill of materials and Order Placements. Click Create Order there and confirm with Continue. How the order is transmitted is set in the respective subscription and isn't something you choose. In Switzerland and Germany, orders are currently sent by CSV upload (e.g. with Krannich, Solarmarkt, Tepto): a CSV file is downloaded, which you upload yourself to the provider's webshop or send by email. With other providers, the order can instead be sent directly by email to a stored contact person.

Keeping track of orders

In the Order Placements tab – right next to Bill of materials on the Order page – you see all orders for this project, with reference, supplier, ordering method, and who ordered and when. Clicking a row reopens that order.

Did this answer your question?