Prerequisites
Hall buttons are configured.
Steps
1.) Position the hall display. By default it's positioned in the door; define other positions via the associated properties window.
2.) Show or hide hall buttons and displays. Both can be shown or hidden on all floors of the elevator project via the properties.
3.) Set the wall finish thickness. Define the thickness of the wall finish.
4.) Check the automatic panel positioning. The panels are positioned automatically, adapted to the wall finish.
Result
Hall displays are positioned, hall buttons and displays are shown or hidden as needed, and the panels follow the configured wall finish automatically.
Next Step




