Overview
Date-and-time logic shows or hides an element or page based on the day of the week. It lets a single Checklist carry tasks that only apply on certain days, instead of building and maintaining a separate Checklist per day.
Why this matters: Most routines are almost the same every day, with a few day-specific extras — a deeper Monday clean, a Friday stock count. Day-of-week logic keeps all of that in one Checklist, so operators always open the same one and the right tasks simply appear on the right day.
How it works
Attach the logic to the element or page and select the days of the week it should appear on. When a User runs the Checklist, Mobaro checks the current day and shows the element only on the days you chose.
Example
A daily opening Checklist includes a page, "Weekly filter deep-clean," with date-and-time logic set to Monday only. Every other day the page is hidden; on Mondays it appears as part of the same routine the team already runs.
Frequently asked questions
Q: Does this control a scheduled time, like a Calendar schedule?
A: No. This logic decides visibility by day of week within a Checklist. When and how often a Checklist is made available to complete is controlled by its Schedule, not by logic.
Q: How do I set it up?
A: Add logic to the element or page and choose the "based on date and time" condition. See Adding logic to a Checklist.
