Skip to main content

Costs Module User Guide

Recording location costs and running cost reports in Micad IPR

Written by Dave Hyde

Prefer a printable copy? You can download this guide as a PDF from the bottom of this article.

1. About the Costs module

The Costs module lets you record running costs, such as energy, maintenance, rates or cleaning, against any location in your estate: regions, sites, buildings, floors and rooms. Micad IPR works out a cost per m² from each location's net area and shares costs down to the floors and rooms beneath it. You can then report on your costs across the estate in Micad Reports.

This guide covers:

  • opening the Costs module and reading the Location costs page

  • adding, editing and deleting cost elements

  • how costs are shared across floors and rooms

  • exporting costs to Excel

  • running, saving, sharing and scheduling cost reports in Micad Reports.

Key terms

Term

Meaning

Cost element

A named type of cost, for example Energy, Rates or Cleaning.

Value (£)

A total amount for the period, entered as a lump sum.

Cost per m²

The cost divided by the location's net area.

Net area

The location's net area in m², as recorded in IPR. Needed to calculate cost per m² and to share costs.

Cost initiated at

The location level (Region, Site, Building, Floor or Room) that a cost element is created at.

2. Before you start

  • Check net areas are recorded. Without a net area, the cost per m² shows as £0.00 and costs can't be shared out by area.

  • Agree a standard list of cost element names. Reports list costs by cost element, so use the same name everywhere (for example "Electricity" rather than "Elec" in one building and "Electricity" in another).

  • Check your access. If you can't see Costs in the Navigation panel, ask your system administrator.

3. Opening the Costs module

The Costs module is opened from a location, not from the main menu.

  1. In IPR, go to the location you want to work with. Use the Explorer tree, the breadcrumb trail at the top of the page or the search box.

  2. In the Navigation panel on the left, click Costs.

  3. The Location costs page opens for that location. The Costs menu also has Add cost and Return to previous.

Figure 1: The Costs option in the Navigation panel of a building.

4. The Location costs page

The Location costs page lists every cost element that applies to the location you're on.

Figure 2: The Location costs page for a site. The Export To Excel link is highlighted.

Below the table you'll find a total row, the location's net area and the Export To Excel link. The columns are:

Column

What it shows

Cost element

The name of the cost. The coloured icon shows the level it was created at, using the same colours as the breadcrumb trail and Explorer tree (for example region, site or building).

From / To

The period the cost covers.

Value

The cost for this location.

Cost per m²

The value divided by the location's net area.

Delete

Removes the cost element. Only shown on the location where the cost element was created.

Edit

Opens the cost so you can enter or change its figures and dates.

5. Adding a cost element

  1. Open the Location costs page for the location, then click Add cost in the Navigation panel.

  2. In Cost element, type the name of the cost, for example Security.

  3. Under Cost type, choose Value (£) to enter a total amount, or Cost per m² to enter a rate.

  4. Enter the figure in Cost amount or Cost per m². The box for the option you didn't choose stays greyed out.

  5. Enter the From date and To date (DD/MM/YYYY), or pick them from the calendar.

  6. Check the Cost initiated at option (see below).

  7. Click Submit. The Location costs page opens again, showing the new cost element.

Figure 3: Adding a Security cost of £12,000 to a site for the 2026/27 financial year.

Choosing "Cost initiated at"

This option sets the level the cost element is created at. It defaults to the level of the location you're on.

Option

What happens

The current location's level (default)

The cost element is created on this location. The amount you enter is recorded here and shared down to the floors and rooms beneath it by net area.

A lower level, for example Building when adding from a site

The cost element is created on every location of that level beneath this one, for example every building on the site. The amount you enter isn't used: each location starts at £0. Use Edit on each location to enter its own figures.

Tip

Use a lower level when each location has its own bill for the same type of cost, such as a separate electricity supply for each building. It sets up the same cost element across all of them in one go.

Important

You can't change Cost initiated at after saving, because it isn't on the Edit form. If you choose the wrong level, delete the cost element and add it again.

6. Entering or changing figures

  1. On the Location costs page, click Edit on the cost element's row.

  2. Change the Cost type, Cost amount or Cost per m², and the From and To dates as needed.

  3. Click Submit to save, or Cancel to go back without saving.

7. How costs are shared across locations

When a cost has a value, IPR works out the cost per m² from the location's net area. It then applies that rate to each floor and room beneath it, based on their own net areas. You can see each floor's and room's share by opening its Location costs page.

Example: a backlog maintenance cost of £60,000 entered on a building with a net area of 4,512.87 m².

Location

Net area

Cost per m²

Value shown

Building (where the cost was entered)

4,512.87 m²

£13.30

£60,000 entered (£60,186.19 shown, see below)

Basement (floor)

738.61 m²

£13.30

£9,820.05

First Floor (floor)

1,499.18 m²

£13.30

£20,054.43

Corridor on the Basement (room)

67.93 m²

£13.30

£903.15

The rate is shown rounded to £13.30. The calculation uses the exact rate (£60,000 ÷ 4,512.87 m²).

Figure 4: The building's cost element, showing its dates, value and cost per m².

Why doesn't the total match what I entered?

The value shown for a building is built up from its floors and rooms. If their net areas don't add up to the building's net area, the total can differ slightly from the amount you entered. In the example above, the building shows £60,186.19 because its rooms add up to slightly more than its net area. If totals don't match, check the area data for that building.

8. Deleting a cost element

Click Delete on the cost element's row. The Delete button only appears on the location where the cost element was created. If you can't see it, the cost element was created higher up: use the icon colour to find the right level, then delete it from there.

Important

Deleting happens straight away. There's no confirmation message. Deleting removes the cost element from every location it was created on. For example, if a cost element was set up on every building on a site, deleting it from one building removes it from all of them, along with their floors and rooms.

9. Exporting costs to Excel

On the Location costs page, click Export To Excel to download that location's cost table as a spreadsheet. To report across several locations or the whole estate, use Micad Reports (section 10).

10. Cost reports in Micad Reports

Opening the cost reports

  1. Use the Current Application menu at the top left to switch to Micad Reports.

  2. Click Reports for at the top of the page and choose IPR.

  3. In the list on the left, expand Cost to see the five cost reports.

Figure 5: Choosing IPR from the Reports for menu.

Figure 6: The Cost reports in the IPR report list.

The cost reports

Report

What it shows

Filters

Format

Building Costs Totals

The total cost for each cost element, per building.

Region, Site

Excel (XLSX)

Cost Report

The total of all cost elements for each building.

Region, Site, Building

PDF

Costs Breakdown by Department

The total cost for each cost element, broken down by department.

Region, Site, Building

PDF

Room Cost Totals

The total for each selected cost element per room, with the department that owns each room.

Region, Site, Building, Cost Elements

Excel (XLSX)

Total Area and Costs by Department

The total cost of all cost elements for each department.

Region (required), Site, Building

PDF

Running a report

  1. Click the report's name in the Cost list.

  2. Under Select parameters, choose a Region, Site and Building. Leave a filter set to --All-- to include everything. Fields marked * must be filled in.

  3. For Room Cost Totals, choose the cost elements to include from the Cost Elements list, or use the ALL, NONE and INVERSE buttons.

  4. Under Generate report, check the Report name. You can change it if you like.

  5. Click Generate ad hoc report.

  6. Open the Report activity tab to view, download or delete the reports you've generated.

Figure 7: The Room Cost Totals report, with the Generate ad hoc report button highlighted.

Saving your filter choices

Turn on Save parameters before you generate a report to keep your filter choices. Next time, click Import saved parameters to reuse them. You can see your saved sets on the Saved parameters tab.

Emailing a report

Under Share report, add the recipients' email addresses in Add email recipients, then click Share report.

Scheduling a report

Scheduled reports run automatically, for example at the end of each month.

  1. Open the report and click the Schedules tab, then click Add schedule.

  2. Schedule settings: enter a name and description, the start date and time, the time zone and how often it should repeat. Leave Indefinitely on for the schedule to keep running.

  3. Report parameters: choose the filters, in the same way as for an ad hoc report.

  4. Output settings: complete the output options, then save the schedule.

Use Next step to move between the three steps. Your schedules are listed on the Schedules tab, showing the next run, frequency, recipient and last successful run.

Figure 8: Adding a schedule for the Cost Report.

11. Quick answers

If you see…

Why, and what to do

Cost per m² shows £0.00

The location has no net area recorded. Add net areas to the location and the floors and rooms in it.

There's no Delete button

The cost element was created at a higher level. Use the icon colour to find that level and delete it from there.

A building's total doesn't match the amount entered

Its floor and room net areas don't add up to the building's net area. Check the area data.

A cost element added from a site shows £0 on each building

It was created at a lower level (Building). Enter each building's figures using Edit.

I chose the wrong "Cost initiated at" level

Delete the cost element and add it again at the right level.

Rooms are missing from the department reports

These reports group costs by the department assigned to each room. Check the rooms have a department assigned.

Did this answer your question?