Prerequisites
Completed Step 5 — the double deck practice project exists with few floors, and its views are prepared.
Steps
1.) Workflow Step 2 — exchange basic components. Exchange the car frame for a double deck car sling, where all decks serve all floors.
2.) Workflow Step 3 — modify necessary parameters. Set the distance between cars to 3015 mm, the shaft head to 5800 mm, and the shaft pit to 4100 mm.
Result
The car frame is exchanged for a double deck car sling, and the key double-deck parameters (car distance, shaft head, shaft pit) are set.
Next Step
Related Video Tutorial


